Gas-to-Nuclear
Platform brief
Current controlled transition concept
A proposed path from gas-fired steam generation to nuclear steam on a reusable power island.
The reference pairs two HTGR Series 3 modules (300 MWth) with a reusable steam island and steam-source isolation station. Case B calculates 121.2 MWe net on gas and 111.0 MWe net on nuclear heat; these are screening figures pending an OEM dual-mode model and independent checks. The integrated transition is assessed at TRL 2–3; conversion requires technical demonstration and regulatory approval.
121.2MWe gas Case B
111.0MWe nuclear Case B
TRL 2–3transition assessment
Subcomponents
Inspect each system in the interactive Systems Lab
Source material
Controlled specification
The evidence behind the concept
Explore the document.
Read the first three pages of the Gas-to-Nuclear portfolio specification. The complete controlled document is available by request to approved readers.

Next platform / 05FusionExplore ↗
